Construct Pumphouse and
Fuel Storage
Cannon AFB, NM
Project Description:
This new construction of a Type III pumphouse included installing carbon steel jet fuel piping sizes 4” through 16” for the 2,400 GPM pumphouse with 4 each – bulk loading truck fillstands. Talon set two skid mounted bulk off-load stations as well as a 4,000-gallon factory-built aboveground product recovery tank with catwalk and tank appurtenances.
2,200 ft Carbon Steel
1,200 ft Stainless Steel
Piping
New Type III Hydrant System