top of page

Glycol Management Program

Deice Facility

Memphis International Airport, TN

Cover.jpg

Project Description: 

This new construction consists of building a new glycol management system for 24 each – aircraft deicing & anti-icing blending stations and 2 each – truck loading & reclaim stands. 90% of all piping is underground with pipe sizes ranging from 2” through 12”. The system includes 4 each – underground valve vaults, 10 each – 50,000-gallon factory-built aboveground storage tanks (ASTs), 3 each – 25,000-gallon factory-built ASTs, and 16 pumps inside the pumphouse. 

27,800 ft Carbon Steel  
12,500 ft Stainless Steel
Piping
New Glycol Facility
Project Type
bottom of page