Project Description:
This new construction consisted of stainless steel piping for a Type I and Type IV glycol loading system to three glycol truck loading stations with blending cubes. An 8” PVC reclaim system for the spent glycol was installed from a lift station with 2 each – 1400 GPM pumps to two new site-built tanks. Talon installed a 48,000-gallon and a 30,000-gallon factory-built aboveground glycol storage tanks with appurtenances and a 35,000-gallon factory-built underground oil-water separator tank as part of the reclaim system.