New Load Rack
McFarland Terminal, WI
Project Description:
This addition to the existing fuel farm facility consisted of the installation of new piping and skids for a new 2-lane truck loading rack. Other work performed includes setting 3 each – 8,000-gallon factory-built aboveground additive tanks, setting one vapor combustion unit (VCU), and a new entrance drive and gate.
2,300 ft Carbon Steel
Bulk Storage Facility Piping Modifications & Repairs
Piping
Project Type